BTO Radar

November 2026 BTO launch

Merpati Meadow

A Plus BTO project in Geylang. For 4-room flats, 263 applicants applied for 271 units; the first-timer application rate was 0.7.

PlusGeylang BTO history
2-Room Flexi4-Room

4-room first-timer rate

0.7

applicants per flat

4-room applicants

263

4-room units

271

Second-timer rate

3.6

applicants per flat

Application rates

Final figures published by HDB for each flat type.

First-timer applicants per flat1.0 = one first-timer applicant per flat
2-room Flexi167 units
0.3
4-room271 units
0.7

Your odds

What does 0.7 mean for you?

Load this project's 4-room first-timer rate into the calculator with two ballot chances, then adjust.

Flat typeUnitsApplicantsFirst-timer rateSecond-timer rateSeniors rateSingles rate
2-room Flexi 167291 0.3 0.2 1.14.2
4-room 271263 0.7 3.6 ––

Application rate progression snapshots

Official observations and third-party transcriptions of HDB data are labelled separately. Date-only archives use Singapore dates and do not establish a time of day. Repeated unchanged rates do not establish daily demand.

Flat typeSnapshot date / timeSourceUnitsApplicantsFirst-timerSecond-timerSeniorsSingles
2-room Flexi2026-11-04 (SGT; time not stated)Third-party HDB data transcription16771000.20.5
2-room Flexi2026-11-05T09:00:00.000Z (UTC)HDB observation1672910.30.21.14.2
4-room2026-11-04 (SGT; time not stated)Third-party HDB data transcription271690.20.8––
4-room2026-11-05T09:00:00.000Z (UTC)HDB observation2712630.73.6––

Plan financing & rules for Merpati Meadow

Plus classification in Geylang.

Cite or embed Merpati Meadow application rates (CC BY 4.0)

Copy the attribution snippet below to cite this project's official HDB rates in articles, spreadsheets or forum posts:

<a href="https://btoradar.com/bto/2026-11/merpati-meadow">Merpati Meadow (November 2026 BTO launch) application rates & ballot odds — BTO Radar</a> (Source: HDB Flat Portal, updated 2026-11-05)

Source: HDB Flat Portal. Updated 5 November 2026. Figures are collected automatically and checked before publishing; see the methodology.

Other projects in the November 2026 BTO launch

All projects