HDB resale renovation package: costs, HDB rules & the 1-month permit window

What HDB’s renovation rules mean for a resale flat — the Directory of Renovation Contractors, hacking approval, the 1-month completion window for existing blocks — plus 2026 cost references and a package checklist.

Published 16 November 2026. By Cheng Xu, BTO Radar. BTO Radar does not sell renovation packages or take referral fees from contractors.

A "resale renovation package" is a contractor's bundled price for renovating an existing HDB flat. Packages differ by contractor, so this guide covers what stays the same for every resale flat: HDB's renovation rules, which are stricter on time for existing blocks than for new BTO flats, and independent cost references you can check a quote against.

HDB renovation rules that shape a resale package

Every rule below is from HDB, Important Information on Renovations (updated 24 July 2026):

RuleResale flat (existing block)New flat (newly completed block)
Who may renovateOnly contractors listed in HDB's Directory of Renovation Contractors (DRC), including for works that need no permitSame
Hacking or demolishing any wall (partial or complete)Needs HDB's prior written approvalSame
Time to finish approved works1 month from the permit date3 months from the permit date
Window-only works2 weeks from the permit date, by a BCA Approved window contractor listed with HDBSame
General renovation hours9:00am–6:00pm on weekdays and Saturdays; none on Sundays and public holidaysSame
Restricted works (demolishing walls, removing wall or floor finishes, cutting tiles, heavy drilling)9:00am–5:00pm on weekdays only, and no more than 3 consecutive days to demolish walls or remove finishesSame
Notice to neighboursWritten notice to neighbours within 2 units, at least 5 days before work startsSame
PenaltyFine of up to $5,000 for owners who do not use a DRC contractor or breach HDB's renovation rulesSame

The 1-month window matters most. Hacking out old floor and wall finishes is restricted work, so it can only happen on weekdays, which leaves fewer working days. Ask any contractor to show how their schedule fits inside one month from the permit date.

HDB also bars certain works in every flat, including plastering ceilings, raising the floor by more than 50mm (including finishes) with concrete, replacing full-height, 3/4-height or bay windows, and removing safety railings or grilles HDB provided. Toilet floor and wall finishes must not be replaced for 3 years from the block's completion date; you can lay new finishes over them with adhesive. Most resale flats are past this, since the 5-year Minimum Occupation Period only starts at key collection.

What to check in a resale renovation package

Resale works usually start by removing what the previous owner left. These questions follow from HDB's rules (HDB, Important Information on Renovations (updated 24 July 2026)):

  1. Is the contractor on the DRC? Check HDB's contractor search e-Service. The same e-Service lists BCA Approved window contractors.
  2. Does the price include hacking and disposal of existing finishes? HDB says you pay for Town Council haulage and debris removal where it applies, and debris must not go down refuse chutes or floor traps.
  3. Which items need a permit, and who applies? Any hacking needs HDB's written approval before work starts. Work done without a required permit is unauthorised, and HDB can make you reinstate the flat.
  4. Is electrical or gas work included? Electrical installation and alterations need SP Services' prior written approval, and gas pipe changes need Power Gas' approval.
  5. Does the schedule fit 1 month and the weekday-only restricted hours?
  6. Are price, schedule and quality standards written down? HDB is not a party to your contract. If you cannot settle a dispute with the contractor, HDB points to CASE or the Small Claims Tribunals.

Resale renovation cost references (2026)

BTO Radar does not collect renovation prices. The figures below are from Qanvast, 4-room resale HDB renovations (updated 6 May 2026), a set of 10 completed 4-room resale projects, not a survey:

ReferenceAmount
Lowest example: basic works (painting, vinyl overlays in bedrooms, bathroom refresh)$33,000
Highest example: full redesign with a walk-in wardrobe made from a common room$180,000
Qanvast's stated 2026 average for a 4-room resale renovation$70,000–$81,600

Use these to sense-check a quote, not as a price for your flat. The cost depends on how much existing work has to be removed and how many built-ins you want.

Paying for a resale renovation

Renovation is paid separately from the flat. Banks typically lend up to 6 times your monthly income or $30,000, whichever is lower, for a renovation loan (SingSaver, How much renovation loan can I get (updated 23 March 2026)); confirm the terms with your bank. Budget renovation on top of the purchase cash in the 4-room resale cash guide. This guide does not cover CPF use for renovation; confirm with CPF Board before counting on it.

Cite or link to this guide (CC BY 4.0)

Copy the attribution link below to reference this guide in articles, forum posts or research notes:

<a href="https://btoradar.com/guides/hdb-resale-renovation-package">HDB resale renovation package: costs, HDB rules & the 1-month permit window — BTO Radar</a>

Common questions

How long do I have to finish renovating a resale HDB flat?

HDB requires approved renovation works in existing blocks to be completed within 1 month from the date the renovation permit is granted. Newly completed blocks get 3 months, and window-only works get 2 weeks.

Do I need an HDB permit to hack walls in a resale flat?

Yes. HDB says all demolition and hacking of walls, partial or complete, needs its prior written approval. Structural members such as reinforced concrete walls, columns and beams cannot be hacked.

Can any contractor renovate my HDB flat?

No. The Housing & Development (Renovation Control) Rules 2006 require you to engage contractors listed in HDB’s Directory of Renovation Contractors, even for works that need no permit. Owners who do not can be fined up to $5,000.

How much does a 4-room resale HDB renovation cost in 2026?

BTO Radar does not collect renovation prices. Qanvast’s 10 example 4-room resale projects range from $33,000 to $180,000, and Qanvast states a 2026 average of $70,000 to $81,600.