June 2026 BTO launch
Berlayar Rise
A Prime BTO project in Bukit Merah. For 4-room flats, 5285 applicants applied for 988 units; the first-timer application rate was 3.3.
4-room first-timer rate
3.3
applicants per flat
4-room applicants
5,285
4-room units
988
Second-timer rate
23.9
applicants per flat
Application rates
Final figures published by HDB for each flat type.
Your odds
What does 3.3 mean for you?
Load this project's 4-room first-timer rate into the calculator with two ballot chances, then adjust.
Plan financing & rules for Berlayar Rise
Prime classification in Bukit Merah.
Downpayment & EHG split
Calculate the 2.5% or 5% signing downpayment, Key Collection balance and Buyer's Stamp Duty.
Prime MOP & clawback rules
See how the 10-year MOP and subsidy recovery percentage affect net resale proceeds.
Compare all Bukit Merah odds
Rank Bukit Merah BTO pools by your ballot chances and household income.
Cite or embed Berlayar Rise application rates (CC BY 4.0)
Copy the attribution snippet below to cite this project's official HDB rates in articles, spreadsheets or forum posts:
<a href="https://btoradar.com/bto/2026-06/berlayar-rise">Berlayar Rise (June 2026 BTO launch) application rates & ballot odds — BTO Radar</a> (Source: HDB Flat Portal, updated 2026-11-05)
Source: HDB Flat Portal. Updated 5 November 2026. Figures are collected automatically and checked before publishing; see the methodology.