BTO Radar

June 2026 BTO launch

Sembawang Brook

A Standard BTO project in Sembawang. For 4-room flats, 685 applicants applied for 764 units; the first-timer application rate was 0.6.

4-room first-timer rate

0.6

applicants per flat

4-room applicants

685

4-room units

764

Second-timer rate

3.6

applicants per flat

Application rates

Final figures published by HDB for each flat type.

First-timer applicants per flat1.0 = one first-timer applicant per flat
2-room FlexiJoint with Sembawang Portico
0.4
3-roomJoint with Sembawang Portico
0.7
4-roomJoint with Sembawang Portico
0.6
5-room / 3GenJoint with Sembawang Portico
0.4

Your odds

What does 0.6 mean for you?

Load this project's 4-room first-timer rate into the calculator with two ballot chances, then adjust.

Flat typeUnitsApplicantsFirst-timer rateSecond-timer rateSeniors rateSingles rate
2-room Flexi
Joint with Sembawang Portico
4611,307 0.4 0.9 2.34.7
3-room
Joint with Sembawang Portico
187286 0.7 5 ––
4-room
Joint with Sembawang Portico
764685 0.6 3.6 ––
5-room / 3Gen
Joint with Sembawang Portico
623438 0.4 3.4 ––

Plan financing & rules for Sembawang Brook

Standard classification in Sembawang.

Cite or embed Sembawang Brook application rates (CC BY 4.0)

Copy the attribution snippet below to cite this project's official HDB rates in articles, spreadsheets or forum posts:

<a href="https://btoradar.com/bto/2026-06/sembawang-brook">Sembawang Brook (June 2026 BTO launch) application rates & ballot odds — BTO Radar</a> (Source: HDB Flat Portal, updated 2026-11-05)

Source: HDB Flat Portal. Updated 5 November 2026. Figures are collected automatically and checked before publishing; see the methodology.

Other projects in the June 2026 BTO launch

All projects