BTO Radar

February 2026 BTO launch

Tampines Nova

A Plus BTO project in Tampines. For 4-room flats, 3484 applicants applied for 337 units; the first-timer application rate was 7.2.

4-room first-timer rate

7.2

applicants per flat

4-room applicants

3,484

4-room units

337

Second-timer rate

39.2

applicants per flat

Application rates

Final figures published by HDB for each flat type.

First-timer applicants per flat1.0 = one first-timer applicant per flat
2-room Flexi122 units
4
4-roomJoint with Tampines Bliss
7.2

Your odds

What does 7.2 mean for you?

Load this project's 4-room first-timer rate into the calculator with two ballot chances, then adjust.

Flat typeUnitsApplicantsFirst-timer rateSecond-timer rateSeniors rateSingles rate
2-room Flexi 1222,604 4 9 9.1117.5
4-room
Joint with Tampines Bliss
3373,484 7.2 39.2 ––

Application rate progression snapshots

Official observations and third-party transcriptions of HDB data are labelled separately. Date-only archives use Singapore dates and do not establish a time of day. Repeated unchanged rates do not establish daily demand.

Flat typeSnapshot date / timeSourceUnitsApplicantsFirst-timerSecond-timerSeniorsSingles
2-room Flexi2026-02-07 (SGT; time not stated)Third-party HDB data transcription1221,7962.255.884.7
2-room Flexi2026-02-08 (SGT; time not stated)Third-party HDB data transcription1221,9632.466.690.8
2-room Flexi2026-02-09 (SGT; time not stated)Third-party HDB data transcription1222,1172.86.77.297.2
2-room Flexi2026-02-10 (SGT; time not stated)Third-party HDB data transcription1222,2913.27.78103.6
2-room Flexi2026-02-11T15:59:00.000Z (UTC)HDB observation1222,604499.1117.5
4-room2026-02-06 (SGT; time not stated)Third-party HDB data transcription3371,7623.718.9––
4-room2026-02-07 (SGT; time not stated)Third-party HDB data transcription3372,0864.422.5––
4-room2026-02-08 (SGT; time not stated)Third-party HDB data transcription3372,3915.125.4––
4-room2026-02-09 (SGT; time not stated)Third-party HDB data transcription3372,6605.727.8––
4-room2026-02-10 (SGT; time not stated)Third-party HDB data transcription3372,9156.231––
4-room2026-02-11T15:59:00.000Z (UTC)HDB observation3373,4847.239.2––

Plan financing & rules for Tampines Nova

Plus classification in Tampines.

Cite or embed Tampines Nova application rates (CC BY 4.0)

Copy the attribution snippet below to cite this project's official HDB rates in articles, spreadsheets or forum posts:

<a href="https://btoradar.com/bto/2026-02/tampines-nova">Tampines Nova (February 2026 BTO launch) application rates & ballot odds — BTO Radar</a> (Source: HDB Flat Portal, updated 2026-11-05)

Source: HDB Flat Portal. Updated 5 November 2026. Figures are collected automatically and checked before publishing; see the methodology.

Other projects in the February 2026 BTO launch

All projects